TOTAL ENERGY TANKS
|
NEW TANKS |
Total
Energy’s quoted prices are fixed and not subject to any
surcharges. |
Sales contracts for new ASME tanks contain a clause
referencing potential additional surcharges tied to the cost
of steel commodity prices due to the volatility of the
steel market. These surcharges can be significant.
|
Total
Energy tanks come fully equipped with all existing tank
trim.
|
No
tank trim is included. |
10-year warranty on all ASME tanks in the US & Canada:
Total Energy will repair any defects or replace
the tank at our expense. |
One
year warranty. |
Total
Energy tanks are in stock, ready and waiting to meet your
construction schedule. |
Delivery time for new tanks is dependent on a production
schedule and subject to production delays and material
shortages. If additional tanks are ordered later,
their prices and delivery times would be subject to a new
contract and new production schedules. Current
fabrication time for a new tank can be 6-12 months, not including any potential
delays.
|
Older tanks were built with a
superior standard, having been engineered and constructed
with a safety factor of 4 to 1.
|
New tanks are manufactured to the current ASME Code safety
factor of only 3.5 to 1.
|
Since Total Energy does not
need to move our tanks immediately, any delays in the end
user's permitting or construction timeframe can be easily
accommodated. |
Once produced, newly ordered
tanks must be delivered and cannot be stored at the
manufacturer's location. |
Total Energy is capable of delivering up to eight 50,000 gallon tanks or larger and up to six 30,000 gallon tanks or smaller at a time.
|
Typically, new tanks are
delivered 2 at a time, and not back to back resulting in
additional costs and scheduling uncertainties for the end
user. |
Purchasing directly from Total Energy will mean no
contractor mark-up.
|
A typical contractor mark-up
for new tanks is 10 – 20% on the purchase of new tanks and
components. |